Submitted Successfully!
To reward your contribution, here is a gift for you: A free trial for our video production service.
Thank you for your contribution! You can also upload a video entry or images related to this topic.
Version Summary Created by Modification Content Size Created at Operation
1 + 2035 word(s) 2035 2022-01-24 09:50:34 |
2 Format done + 413 word(s) 2448 2022-02-16 03:20:16 |

Video Upload Options

We provide professional Video Production Services to translate complex research into visually appealing presentations. Would you like to try it?

Confirm

Are you sure to Delete?
Cite
If you have any further questions, please contact Encyclopedia Editorial Office.
Cunha, J. Financial Assessment of Renewable Energy Projects. Encyclopedia. Available online: https://encyclopedia.pub/entry/19455 (accessed on 15 November 2024).
Cunha J. Financial Assessment of Renewable Energy Projects. Encyclopedia. Available at: https://encyclopedia.pub/entry/19455. Accessed November 15, 2024.
Cunha, Jorge. "Financial Assessment of Renewable Energy Projects" Encyclopedia, https://encyclopedia.pub/entry/19455 (accessed November 15, 2024).
Cunha, J. (2022, February 15). Financial Assessment of Renewable Energy Projects. In Encyclopedia. https://encyclopedia.pub/entry/19455
Cunha, Jorge. "Financial Assessment of Renewable Energy Projects." Encyclopedia. Web. 15 February, 2022.
Financial Assessment of Renewable Energy Projects
Edit

Financial assessment of renewable energy projects is to help decision-makers invest in renewable energy sources (RES) technologies, it is essential to have reliable indicators capable of measuring a project’s total performance. Despite the global increase in renewable energy sources (RES) investments associated with economic and population growth, few studies have presented a comprehensive evaluation mechanism for RES projects, mainly due to the multiplicity of variables capable of influencing the viability of these endeavors. Therefore, building models that allow an efficient and holistic measurement is a difficult task.

discounted cash flow net present value levelized cost of energy return on investment real options

1. Introduction

The development of tools for valuing renewable energy-generation projects is essential to encourage the undertaking of these initiatives. The study of RES represents a relevant field of research not only because of the foreseen technical developments but also because of the multidisciplinary approach needed to assess these projects from the social, environmental, and financial perspectives. The doubts about the feasibility of continuous investments in energy infrastructure based on fossil fuels have contributed to stimulating new frontiers for studies related to renewable energy projects [1].
Most large RES projects are financed in the Project Finance category and have a high demand for long-term capital. The main characteristics of this type of financing structure is the use of the project’s own cash flow and the creation of a specific and legally independent company, the Special Purpose Vehicle (SPV), to carry out the project [2]. Several methods can be used to measure the financial performance of a project, such as its cash flow analysis, revenue evolution, market share growth, among others. However, the option for project finance to finance large projects in renewable energy generates additional transaction costs due to the complexity of its formatting. This reality requires an additional effort for identifying methods capable of efficiently measuring its performance [3].

2. Project Evaluation Techniques

To help decision-makers invest in RES technologies, it is essential to have reliable indicators capable of measuring a project’s total performance, comparing it with the feasibility of other alternatives. Several tools are used to measure the feasibility of RES projects. For example, Ramadan et al. [4] applied net present value (NPV) combined with an annual Return on Investment (ROI). NPV can also be used as a standalone tool or combined with the Internal Rate of Return (IRR) [5]. Carneiro and Ferreira [6] also explored the use of NPV associated with IRR and Payback Period (PBP) while Talavera et al. [7] applied NPV with IRR and Levelized Cost of Electricity (LCOE).
Although most of the current studies on the feasibility of RES projects are based on the use of more than one indicator, the classic NPV has been the most popular indicator for evaluating investments in general [8][9]. However, the long-term investment characteristic of RES projects can compromise the reliable application of traditional indicators to measure viability [10][11]. The NPV represents the total value of the project at the current value, considering a discount rate that reflects the risk at which the investor demands to be remunerated [12]. NPV is considered the most theoretically reliable tool from a financial perspective since it measures value creation [8].
Another indicator widely used in RES projects is the IRR, expressed by the interest rate for which the project’s NPV is zero. When the future cash flows of a project are discounted using the IRR, the present value of cash outflows equals the present value of cash inflows [13]. IRR is generally used with the NPV in the evaluation of projects [14]. Ref. [15] discussed the IRR and argues that joint with NPV, it represents the second measure of the project profitability. It is based on a non-dimensional scale while NPV represents a monetary quantity.
The Payback Period (PBP) is an indicator that aims at expressing the time to recover the investment in a project. The PBP is the number of years or months necessary for the gross value of the inputs and outputs to be equal [7]. PBP can be used with or without considering the time value of money. When this is taken into account, the method is called the Discounted Payback Period, otherwise is frequently called Simple Payback Period. Despite its easy understanding and usability, PBP disregards existing cash flows after the investment is recovered, and is a very limited tool for decision making [16].
Another approach to measuring the feasibility of RES projects is based on cost analysis. In this approach, it is possible to identify the concepts of Cost of Electricity, also called Cost of Energy (COE) [17] or Levelized COE (LCOE) [18], defined as the average cost ($) per kWh of energy produced by the system [19]. Aussel et al. [20] claimed that the LCOE indicator is widely used for energy projects, and Siddaiah and Saini [21] highlighted LCOE as the preferred indicator for minimizing the lifecycle cost of a project. Although several studies are adopting the present value view of project costs, [22] demonstrated that LCOE represents not a discounted metric but rather an undiscounted metric. Moreover, the author argues that the present value approach of costs excessively penalizes projects with a longer life cycle. However, the LCOE remains a fundamental metric widely disseminated among the energy industry, academics, and organizations (see, for example, [23][24][25][26].
The ROI, defined as the annual cost saving over the invested capital [19] or as the annual average net profit over the invested capital [27], is also a common criterion used for analyzing the economic viability of RES projects [19]. Although ROI is strongly linked to NPV in investment valuation [8], some studies use these two indicators as complementary metrics [27]. Other papers highlight that the ROI parameters may not incorporate the time value of money [28], and, for this reason, the metric could be used as an independent financial parameter. A variation of ROI is the Energy ROI (EROI), defined as the proportion of the plant’s usable energy over the energy invested in the plant [29], which will not be considered in this paper.
Given the need to value the managerial flexibility of projects in light of a future of uncertainty and change, some tools can be explored. Real options analysis (ROA), which seeks to price the future uncertainty of these projects, can be used as an indicator that complements traditional metrics based on a deterministic cash flow [30]. The real options theory has been applied with increasing frequency to the evaluation of RES projects [31][32][33]. Decisions are assumed to be fixed in the traditional analysis of investments through discounted cash flow, not allowing managers to expand or retract investments beyond the initial project estimate [30]. The term real options is used to express the options that are embedded in investment opportunities, such as suspending, postponing, or abandoning the investment, and reducing or expanding the scale of operations [34]. ROA can be considered a complementary tool in the analysis of project feasibility. Ref. [32] compared the traditional NPV method to the expanded NPV method that considers the flexibilities of a specific project. The authors concluded, as expected, that the value of NPV using ROA is greater than the traditional calculation since a real option can give flexibility and then add value to the project.
Table 1 summarizes these project evaluation techniques including the simplified equations for their calculation and some of the main related concepts/ideas. Although different categorizations of the financial evaluation methods have been proposed in the literature [35][20][36][37], in this paper those methods are grouped in four categories, for the qualitative analysis purpose: (i) Traditional Project Evaluation Methods (TPEM), expressed by metrics that evaluate the viability of projects by discounting cash flows: NPV, IRR and Payback period; (ii) Cost analysis approach, represented by the Levelized Cost of Energy (LCOE); (iii) Return on Investment (ROI); and (iv) Real Options Analysis (ROA) that takes into account in the decision-making process the managerial flexibility associated with the investment decision.
Table 1. Project Valuation Techniques.
Categories Technique Equation Nomenclature Key Concepts
Traditional Project Evaluation Methods (TPEM) Net Present Value (NPV) CF = Cash Flow in the year i;
N = Project lifetime, in years;
k = Annual discount rate.
Based on the discounted cash flow approach.
Depends on a predefined discount rate.
Measures value creation in monetary terms.
Deterministic reject/accept decision (accept if NPV > 0).
Internal Rate of Return (IRR)

 

CFi = Cash Flow in the year i;
k = Annual discount rate;
N = Project lifetime, in years.
Based on the discounted cash flow approach.
Expressed by the interest rate for which the project’s NPV is zero.
Measures value creation as a rate of return (%).
Deterministic reject/accept decision (accept if IRR > pre-defined hurdle rate).
Discounted Payback Period (PBP) I = Initial investment; CFi = Cash Flow in the year i;
k = Annual discount rate;
Np = Number of years until the investment is recovered.
Based on the discounted cash flow approach.
Expressed by the time (usually years) required to recover the investment.
It can be used as a simplified proxy for risk.
Deterministic reject/accept decision (accept if PBP < pre-defined value).
Levelized Cost of Electricity (LCOE) [38] Levelized Cost of Electricity (LCOE) N = Project lifetime, in years;
k = Annual discount rate;
MWh = Amount of electricity produced annually in MWh;
Capitali = Total capital construction costs in the year i;
O&Mi = Operation and maintenance costs in the year i;
Fueli = Fuel costs in year i;
Carboni = Carbon costs in the year i;
Di = Decommissioning and waste management costs in the year i
Identifies the unit cost of energy over the life of the project.
Computed by dividing all costs generated by the energy system by the amount of energy produced by that system.
Frequently used to compare technologies /projects.
Return on Investment (ROI) Return on Investment (ROI)   Computed as percentage ratio between the annual net profit (net cash flow) over the life of the project and the total capital investment in the project.
Real Options Analysis (ROA) Real Options Analysis (ROA) NPV_expanded = NPV_Deterministic + NPV_Flexibility NPVDetermistic= Tradicional NPV
NPVFlexibility= Uncertain cash flow value to be added, due to the existence of a real option embedded in the project.
Express the options that are embedded in investment opportunities.
Incorporates uncertainty/risk in the analysis.
Options may include suspending, postponing, abandoning, reducing, or expanding the investment.
In summary, some critical points can be highlighted:
  • The scientific studies seem to be well aligned with the RES growth with the reviewed papers reflecting a high interest in well-established RES technologies and in countries or regions with high RES share.
  • Traditional models based on DCF still play a dominant role in the scientific community. Although a large number of financial evaluation techniques can be found in the literature, see for example [39][40], the most used to determine whether an investment project should be accepted or not are the NPV, IRR, and PBP [41]. Since project finance is a form of funding that relies on the forecast profitability of the project, not on the creditworthiness of the company [42], the characteristics of using the project’s cash flow for its valuation help explain this dominance. Although the studies recognize the limitations and discuss, in particular, the importance of the assumed discount rate, the use of NPV, PBP, and IRR still seem to guide most investment decisions. Simple PBP methods are rarely used as a single approach and in most cases, they are included as one decision criterion among others or as a starting point for the development of other metrics.
  • As for LCOE, although being extensively criticized in the literature, still represents a remarkable method to be used for example for benchmarking different technologies. This interest might be justified because it is intuitively clear and allows the comparison of the relative costs of different energy types [43]. The viability analysis of residential projects focused on distributed generation is a good example of the extensive LCOE application, and specialized software in these studies contributed to the high popularity of this indicator.
  • As for ROA, the results suggest that this methodology is yet not as popular as might be expected for authors in USA institutions. However, its popularization among authors from institutions located in Europe, where renewable energy systems are more developed, as well as among authors from institutions located in China, where there is a great potential for the development of this sector, can demonstrate its usefulness as a tool to analyze the viability of projects, albeit in a complementary way. The ROA does not replace the NPV but, rather, improved it by explicitly accounting for risk and managerial flexibility. ROA is increasingly recognized as an important approach but its complexity severely undermines its wide utilization. In particular, when communication with the final user is required or when energy planning and policies need to be clearly justified these simpler measures take a dominant role.
  • Both LCOE and ROA papers demonstrate the need to bring together industrial practitioners and the academic community by turning simpler methods into scientifically robust ones and disentangling complex approaches to respond to industrial needs.

3. Conclusions

Herein identified that, in the context of scientific papers, the most widespread RES projects are related to wind and solar energy.
The most traditional tools used to evaluate RES projects are more popular in solar energy than wind energy while more complex mechanisms such as ROA are more widespread in studies related to wind energy. The dissemination of instruments and techniques to measure the uncertainties related to the incidence of winds can explain this empirical evidence.
From a geographical point of view, looking at author affiliations, the most traditional techniques are more common in publications from countries such as the USA, Italy, Spain, and Germany, while Asian countries, such as China and South Korea, have higher scientific production involving the technique based on real options.
The critical analysis provided some future research directions. Future research could analyze how these RES evaluation techniques vary and how they can be associated with other techniques to build more reliable and effective performance indicators. In fact, only about 23% of the reviewed studies seem to show some interlinkage between each other somehow overlooking the complementarities of these indicators. In particular, the use of TPEM with ROA is well established, but LCOE is still frequently used as an independent method that could benefit from integration in more holistic studies, for example addressing uncertainties of the energy markets and technology development.
Although the linkage between financial studies and well-established RES technologies is evident, additional research is required to address promising new RES technologies or emerging enabling technologies. For these innovative projects, risk and flexibility-related approaches are particularly relevant, and ROA can bring important insights. However, the use of ROA is still limited, which may derive from the perceived complexity of application and interpretation, particularly for lay people/investors. As such, future studies should focus on identifying factors that prevent greater dissemination and usability of more complex investment appraisal methods and even promote a “user-friendly” approach to these methods.

References

  1. Detert, N.; Kotani, K. Real options approach to renewable energy investments in Mongolia. Energy Policy 2013, 56, 136–150.
  2. Firouzi, A.; Meshkani, A. Risk-based optimization of the debt service schedule in renewable energy project finance. Util. Policy 2021, 70, 101197.
  3. Steffen, B. The importance of project finance for renewable energy projects. Energy Econ. 2018, 69, 280–294.
  4. Ramadan, O.; Omer, S.; Ding, Y.; Jarimi, H.; Chen, X.; Riffat, S. Economic evaluation of installation of standalone wind farm and wind + CAES system for the new regulating tariffs for renewables in Egypt. Therm. Sci. Eng. Prog. 2018, 7, 311–325.
  5. Delapedra-Silva, V.A.; Ferreira, P.; Cunha, J.; Kimura, H. Economic Evaluation of Wind Power Projects in a Mix of Free and Regulated Market Environments in Brazil. Energies 2021, 14, 3325.
  6. Carneiro, P.; Ferreira, P. The economic, environmental and strategic value of biomass. Renew. Energy 2012, 44, 17–22.
  7. Talavera, D.L.; Nofuentes, G.; Aguilera, J.; Fuentes, M. Tables for the estimation of the internal rate of return of photovoltaic grid-connected systems. Renew. Sustain. Energy Rev. 2007, 11, 447–466.
  8. Marchioni, A.; Magni, C.A. Investment decisions and sensitivity analysis: NPV-consistency of rates of return. Eur. J. Oper. Res. 2018, 268, 361–372.
  9. Shimbar, A.; Ebrahimi, S.B. Political risk and valuation of renewable energy investments in developing countries. Renew. Energy 2020, 145, 1325–1333.
  10. Shimbar, A.; Ebrahimi, S.B. Modified-decoupled net present value: The intersection of valuation and time scaling of risk in energy sector. Environ. Energy Econ. Res. 2017, 1, 347–362.
  11. Espinoza, R.D. Separating project risk from the time value of money: A step toward integration of risk management and valuation of infrastructure investments. Int. J. Proj. Manag. 2014, 32, 1056–1072.
  12. Žižlavský, O. Net present value approach: Method for economic assessment of innovation projects. Procedia-Social Behav. Sci. 2014, 156, 506–512.
  13. McAllister, E.W. Pipeline Rules of Thumb Handbook: A Manual of Quick, Accurate Solutions to Everyday Pipeline Engineering Problems, 7th ed.; Gulf Professional Publishing: Houston, TX, USA, 2013.
  14. Arranz-Piera, P.; Kemausuor, F.; Darkwah, L.; Edjekumhene, I.; Cortés, J.; Velo, E. Mini-grid electricity service based on local agricultural residues: Feasibility study in rural Ghana. Energy 2018, 153, 443–454.
  15. Mellichamp, D.A. Internal rate of return: Good and bad features, and a new way of interpreting the historic measure. Comput. Chem. Eng. 2017, 106, 396–406.
  16. Cucchiella, F.; D’Adamo, I.; Gastaldi, M.; Miliacca, M. A profitability analysis of small-scale plants for biomethane injection into the gas grid. J. Clean. Prod. 2018, 184, 179–187.
  17. Upadhyay, S.; Sharma, M.P. Selection of a suitable energy management strategy for a hybrid energy system in a remote rural area of India. Energy 2016, 94, 352–366.
  18. Bahrami, A.; Teimourian, A.; Okoye, C.O.; Khosravi, N. Assessing the feasibility of wind energy as a power source in Turkmenistan; a major opportunity for Central Asia’s energy market. Energy 2019, 183, 415–427.
  19. Elkadeem, M.R.; Wang, S.; Sharshir, S.W.; Atia, E.G. Feasibility analysis and techno-economic design of grid-isolated hybrid renewable energy system for electrification of agriculture and irrigation area: A case study in Dongola, Sudan. Energy Convers. Manag. 2019, 196, 1453–1478.
  20. Aussel, D.; Neveu, P.; Tsuanyo, D.; Azoumah, Y. On the equivalence and comparison of economic criteria for energy projects: Application on PV/diesel hybrid system optimal design. Energy Convers. Manag. 2018, 163, 493–506.
  21. Siddaiah, R.; Saini, R.P. A review on planning, configurations, modeling and optimization techniques of hybrid renewable energy systems for off grid applications. Renew. Sustain. Energy Rev. 2016, 58, 376–396.
  22. Loewen, J. LCOE is an undiscounted metric that distorts comparative analyses of energy costs. Electr. J. 2019, 32, 40–42.
  23. IRENA. Renewable Energy Capacity Statistics 2020. Available online: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2020/Mar/IRENA_RE_Capacity_Statistics_2020.pdf (accessed on 21 May 2021).
  24. IRENA. Renewable Capacity Statistics 2020. Available online: https://www.irena.org/publications/2020/Mar/Renewable-Capacity-Statistics-2020 (accessed on 10 August 2021).
  25. IEA. Market Analysis and Forecast from 2019 to 2024. Available online: https://www.iea.org/reports/renewables-2019 (accessed on 10 August 2021).
  26. Fraunhofer, I.S.E. Levelized Cost of Electricity Renewable Energy Technologies. Available online: https://www.ise.fraunhofer.de/content/dam/ise/en/documents/publications/studies/EN2018_Fraunhofer-ISE_LCOE_Renewable_Energy_Technologies.pdf (accessed on 8 June 2021).
  27. Do, T.X.; Lim, Y.; Yeo, H.; Lee, U.; Choi, Y.; Song, J. Techno-economic analysis of power plant via circulating fluidized-bed gasification from woodchips. Energy 2014, 70, 547–560.
  28. Jana, K.; De, S. Techno-economic evaluation of a polygeneration using agricultural residue—A case study for an Indian district. Bioresour. Technol. 2015, 181, 163–173.
  29. Weißbach, D.; Ruprecht, G.; Huke, A.; Czerski, K.; Gottlieb, S.; Hussein, A. Energy intensities, EROIs (energy returned on invested), and energy payback times of electricity generating power plants. Energy 2013, 52, 210–221.
  30. Kozlova, M. Real option valuation in renewable energy literature: Research focus, trends and design. Renew. Sustain. Energy Rev. 2017, 80, 180–196.
  31. Martín-Barrera, G.; Zamora-Ramírez, C.; González-González, J.M. Application of real options valuation for analysing the impact of public R&D financing on renewable energy projects: A company′s perspective. Renew. Sustain. Energy Rev. 2016, 63, 292–301.
  32. Santos, L.; Soares, I.; Mendes, C.; Ferreira, P. Real Options versus Traditional Methods to assess Renewable Energy Projects. Renew. Energy 2014, 68, 588–594.
  33. Fernandes, B.; Cunha, J.; Ferreira, P. The use of real options approach in energy sector investments. Renew. Sustain. Energy Rev. 2011, 15, 4491–4497.
  34. Lambrecht, B.M. Real options in finance. J. Bank. Financ. 2017, 81, 166–171.
  35. Dranka, G.G.; Cunha, J.; de Lima, J.D.; Ferreira, P. Projects, Economic evaluation methodologies for renewable energy. AIMS Energy 2020, 8, 339–364.
  36. Siziba, S.; Hall, J.H. The evolution of the application of capital budgeting techniques in enterprises. Glob. Financ. J. 2019, 47, 100504.
  37. Wu, Z.; Sun, H. Behavior of Chinese enterprises in evaluating wind power projects: A review based on survey. Renew. Sustain. Energy Rev. 2015, 43, 133–142.
  38. IEA. Projected Costs of Generating Electricity. 2020. Available online: https://iea.blob.core.windows.net/assets/ae17da3d-e8a5-4163-a3ec-2e6fb0b5677d/Projected-Costs-of-Generating-Electricity-2020.pdf (accessed on 10 August 2021).
  39. Remer, D.S.; Nieto, A.P. A compendium and comparison of 25 project evaluation techniques. Part 1: Net present value and rate of return methods. Int. J. Prod. Econ. 1995, 42, 79–96.
  40. Remer, D.S.; Nieto, A.P. A compendium and comparison of 25 project evaluation techniques. Part 2: Ratio, payback, and accounting methods. Int. J. Prod. Econ. 1995, 42, 101–129.
  41. Biezma, M.V.; San Cristobal, J.R. Investment criteria for the selection of cogeneration plants—A state of the art review. Appl. Therm. Eng. 2006, 26, 583–588.
  42. Crundwell, F. Finance for Engineers: Evaluation and Funding of Capital Projects; Springer Science and Business Media: Berlin/Heidelberg, Germany, 2008; ISBN 1848000332.
  43. Loewen, J. LCOE is an undiscounted metric that inaccurately disfavors renewable energy resources. Electr. J. 2020, 33, 106769.
More
Information
Contributor MDPI registered users' name will be linked to their SciProfiles pages. To register with us, please refer to https://encyclopedia.pub/register :
View Times: 2.6K
Revisions: 2 times (View History)
Update Date: 16 Feb 2022
1000/1000
ScholarVision Creations