| Version | Summary | Created by | Modification | Content Size | Created at | Operation |
|---|---|---|---|---|---|---|
| 1 | Dean Liu | -- | 5352 | 2022-11-16 01:43:33 |
International Thermonuclear Experimental Reactor is an international nuclear fusion research and engineering megaproject, which will be the world's largest magnetic confinement plasma physics experiment. It is an experimental tokamak nuclear fusion reactor that is being built next to the Cadarache facility in Saint-Paul-lès-Durance, in Provence, southern France. The ITER thermonuclear fusion reactor has been designed to produce a fusion plasma equivalent to 500 megawatts (MW) of thermal output power for around twenty minutes while 50 megawatts of thermal power are injected into the tokamak, resulting in a ten-fold gain of plasma heating power. Thereby the machine aims to demonstrate the principle of producing more thermal power from the fusion process than is used to heat the plasma, something that has not yet been achieved in any fusion reactor. The total electricity consumed by the reactor and facilities will range from 110 MW up to 620 MW peak for 30-second periods during plasma operation. Thermal-to-electric conversion is not included in the design because ITER will not produce sufficient power for net electrical production. The emitted heat from the fusion reaction will be vented to the atmosphere. The project is funded and run by seven member entities—the European Union, India , Japan , China , Russia , South Korea and the United States . The EU, as host party for the ITER complex, is contributing about 45 percent of the cost, with the other six parties contributing approximately 9 percent each. In 2016 the ITER organization signed a technical cooperation agreement with the national nuclear fusion agency of Australia , granting this country access to research results of ITER in exchange for construction of selected parts of the ITER machine. Construction of the ITER Tokamak complex started in 2013 and the building costs were over US$14 billion by June 2015. The construction of the facility is expected to be completed in 2025 when commissioning of the reactor can commence. Initial plasma experiments are scheduled to begin in 2025, with full deuterium–tritium fusion experiments starting in 2035. If ITER becomes operational, it will become the largest magnetic confinement plasma physics experiment in use with a plasma volume of 840 cubic meters, surpassing the Joint European Torus by almost a factor of 10. The goal of ITER is to demonstrate the scientific and technological feasibility of fusion energy for peaceful use. It is the largest of more than 100 fusion reactors built since the 1950s. ITER's planned successor, DEMO, is expected to be the first fusion reactor to produce electricity in an experimental environment. DEMO's anticipated success is expected to lead to full-scale electricity-producing fusion power stations and future commercial reactors.