Submitted Successfully!
To reward your contribution, here is a gift for you: A free trial for our video production service.
Thank you for your contribution! You can also upload a video entry or images related to this topic.
Version Summary Created by Modification Content Size Created at Operation
1 -- 1144 2022-06-30 03:31:09 |
2 update references and layout -3 word(s) 1141 2022-06-30 03:40:46 |

Video Upload Options

Do you have a full video?

Confirm

Are you sure to Delete?
Cite
If you have any further questions, please contact Encyclopedia Editorial Office.
Deep, S.;  Banerjee, S.;  Dixit, S.;  Vatin, N.I. Critical Factors of Performance of Highway Projects. Encyclopedia. Available online: https://encyclopedia.pub/entry/24652 (accessed on 17 May 2024).
Deep S,  Banerjee S,  Dixit S,  Vatin NI. Critical Factors of Performance of Highway Projects. Encyclopedia. Available at: https://encyclopedia.pub/entry/24652. Accessed May 17, 2024.
Deep, Shumank, Shankar Banerjee, Saurav Dixit, Nikolai Ivanovich Vatin. "Critical Factors of Performance of Highway Projects" Encyclopedia, https://encyclopedia.pub/entry/24652 (accessed May 17, 2024).
Deep, S.,  Banerjee, S.,  Dixit, S., & Vatin, N.I. (2022, June 30). Critical Factors of Performance of Highway Projects. In Encyclopedia. https://encyclopedia.pub/entry/24652
Deep, Shumank, et al. "Critical Factors of Performance of Highway Projects." Encyclopedia. Web. 30 June, 2022.
Critical Factors of Performance of Highway Projects
Edit

Highway construction projects have always suffered from cost overruns due to extended project delivery, causing a loss of public funds. Highway projects have had unsatisfactory performance due to time and expense overruns. Also, prompt completion, minimal cost overruns, no on-site dangers, and a sufficient quality standard have all been identified as indicators of a successful project . 

highway projects execution constraints construction projects

1. Introduction

Highway projects are the backbone of and a significant contributor to the growth of a nation’s economy by ensuring seamless transportation for all. In the present scenario, the government of India prefers to execute highway construction projects using PPP modes in which “Built operate and transfer (BOT)” and “Design-build finance operate and transfer (DBFOT)” are predominant approaches for the execution of various national highway projects [1]. Construction and infrastructure projects in India are vital components of the countries’ productive capacity and efficiency. With the recent slowdown in economic activities, the pace of highway construction is also declining; in the current financial year, it has slowed down to 27 km per day as compared to the previous year’s 30 km per day. This has resulted in a reduction in highway completion targets by the government to 6000 km for the current financial year.
Leigland [2] has stated that the private sector’s interest in public–private partnerships (PPPs) has dramatically fallen since 2012. Losses incurred as a result of cost overruns, disputes, and claim settlements are the major cause of conflicts, and interruptions can be the reason for this [3]. This is due to a lack of correct information visibility, which contributes to the industry’s tendency toward decreased profit margins and poorer productivity [4]. As a result, highway construction projects have been vulnerable to a variety of delay-causing issues such as pollution on the job site, supplier insolvency during construction, logistic failure, and community opposition, to name a few [5]. In addition, the lack of transparency and information exchange in this industry has had an impact on productivity [6][7][8].

2. Theoretical Background about Critical Factors of Performance of Highway Projects

Overruns have been a regular and redundant phenomenon impacting the performance and overall project delivery of highway projects [9]. Currently, the major challenge in Indian road construction projects is an encroachment on the right of way, acquisition of land, and disputes between contracting parties, though the scope of such conflicts was limited to the maintenance and relaying of village road projects. The procurement selection for strategic construction, e.g., major highways and expressways, are handled through the use of the built, operate, and transfer method [5][10]. However, from the information received through the Right to Information Act, 2005 (RTI), over 35% of road/highway construction projects were delayed due to claims and counter claims, and approximately 10% were subjected to arbitration. Figure 1 provides a summary of disputes reported in various State Highway, Other District Roads (ODR) and Major District Roads (MDR) for the financial year 2015–2019; this information was obtained through RTI.
Figure 1. Delayed highway/road construction projects (Source: Information through RTI).
As per RTI application (information obtained through RTI application reference no MORTH/R/2019/50050 and CPWDN/R/2019/50005), the major reasons identified for causing delays are mentioned as follows:
  • Incomplete works;
  • Disruption due to encroachments in right of way;
  • Socio-political reasons;
  • Delayed payments;
  • Work not conforming to the desired quality
The aforesaid identified reason creates risks that negatively impact project progression. Therefore, there was a need to explore the global scenario and identify the critical factors through the analysis of recent literature. The construction industry is mostly dependent on a several number of variables and participants, and because of this, to achieve the expected level of performance, an appropriate management technique for procurement planning and project execution is vital [11]. The selection of correct procurement has a direct influence on project performance [12][13][14][15][16][17]. Fulfilling the end user’s requirements, achieving optimal performance and sustainability are prime requirements of PPP projects because of their direct impact on public infrastructure projects. To achieve the objective above, a public–private–people partnership (4P) procurement strategy was proposed which integrated “people,” with a target of improving value for money and to promote sustainability in infrastructure [18]. Furthermore, some of the common risks that prevail throughout the life cycle of a highway construction project are:
  • Loophole in site safety leading to accidents and injuries [19][20];
  • Constraints due to managing change orders [21][22];
  • Unknown site conditions [21];
  • Poorly written contracts [8];
  • Unpredictable prices of raw materials [23];
  • Seasonal shortage of laborers [24];
  • Damage to or breakdown of equipment and tools [25][26];
  • Disagreement with the sub-contractors [27];
  • Lack of efficient project management skills [28]
Besides the aforesaid factors, the highway project in itself has a very complex nature, and lack of trust and coordination happens to impact productivity; hence, managing risks efficiently becomes a vital task [18][29][30][31][32]. The execution of the highway projects is a very exhaustive task when it comes to managing a project site located over a vast chunk of land. Efficient project management skills become vital, as they influence decision making it terms of procurement design and contractor selection [18][32]. In the current scenario, the Indian construction industry places a heavy emphasis on price-based supplier selection rather than trust-building measures such as early contractor involvement approaches, leading to the perception that favoritism and opportunism are still prevalent approaches to project awarding [33]. As a result, there are project delays to claims and counter claims due to dissatisfied subcontractors. This tendency is caused by a focus on project specific requirements, i.e., there is an ever-changing group of suppliers or subcontractors at the lower level of hierarchy varying through different projects, constraining the development of a cohesive and lasting relationship [34][35]. Furthermore, the observations from responses received in RTI application also indicated that the highway projects are also to a greater extent influenced by political favoritism specifically on the Indian subcontinent which indicates the impact of the current socio-political scenario, as indicated by researchers [36][37][38][39]. Furthermore, it was also observed that the local bodies tend to influence the contractors to lease their equipment which is ill maintained; however, this problem was limited to small scale works and mostly maintenance of the service roads and so on. However, the major problem that the contractors/subcontractors were concerned about was the theft of their equipment and the lack of a local availability of servicing facilities, ultimately resulting in the breakdown of machinery [25][27][28]. Thus, the exhaustive review leads to the identification of the following factors: delay from the clients; unprecedented price in raw materials; frequent modification from the client side; delay in land acquisition; inadequate and incomplete design; encroachment in the right of way; disputes between laborers; changing sequences in construction activity; change in quantities of work; adequate equipment; service for damaged equipment; impact of weather conditions on a project; pressure from any political party; local bodies compelling to use their resources; chances of sub-contractor walk out; delay in work execution of sub-contractor; revision of price. Hence, implications of these factors should be explored in the Indian Scenario.

References

  1. Bhatt, N.; Sarkar, D. Evaluation of success and risk factors for highway project performance through integrated analytical hierarchy process and fuzzy interpretive structural modelling. Int. J. Constr. Manag. 2020, 20, 653–665.
  2. Leigland, J. Hybrid Infrastructure PPPs in India: Costs, Benefits, and Emerging Risks. J. Struct. Financ. 2020, 26, 45–55.
  3. Garg, S.; Mahapatra, D. Opportunism Galore: The Case of Delhi–Gurgaon Super Connectivity Limited. In The Emerald Handbook of Public–Private Partnerships in Developing and Emerging Economies; João, L., Elsa de Morais, S., João, A., Eds.; Emerald Publishing Limited: Bingley, UK, 2017; pp. 489–512.
  4. Ojha, R.; Vrat, P. Integrated impact of highway infrastructure, labour productivity and circular material consumption on Indian manufacturing growth. J. Adv. Manag. Res. 2017, 14, 527–542.
  5. Bayat, M.; Khanzadi, M.; Nasirzadeh, F.; Chavoshian, A. Financial conflict resolution model in BOT contracts using bargaining game theory. Constr. Innov. 2019; ahead of print.
  6. Dolla, T.; Laishram, B. Bundling/unbundling decision in PPP infrastructure projects–the case of Guwahati city, India. Int. J. Manag. Proj. Bus. 2019, 12, 520–544.
  7. Jain, A.; Khan, F.; Gupta, P.; Gupta, K.; Yadav, S. Challenges faced in PPP and ham model and the need for an alternative. J. Civ. Eng. Sci. Technol. 2019, 10, 82–93.
  8. Neto, D.D.C.E.S.; Cruz, C.O.; Rodrigues, F.; Silva, P. PPP Development and Governance in Latin America: Analysis of Brazilian State PPP Units. J. Infrastruct. Syst. 2020, 26, 05020003.
  9. Iyer, K.C.; Jha, K.N. Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. J. Constr. Eng. Manag. 2006, 132, 871–881.
  10. Le, P.T.; Chileshe, N.; Kirytopoulos, K.; Rameezdeen, R. Investigating the significance of risks in BOT transportation projects in Vietnam. Eng. Constr. Archit. Manag. 2020, 14, 1401–1425.
  11. Shrestha, P.P.; Batista, J. Lessons learned in design-build and construction-manager-at-risk water and wastewater project. J. Leg. Aff. Disput. Resolut. Eng. Constr. 2020, 12, 04520002.
  12. Kumaraswamy, M.M.; Dissanayaka, S.M. Linking procurement systems to project priorities. Build. Res. Inf. 1998, 26, 223–238.
  13. Love, P.E.D.; Irani, Z.; Smith, J.; Regan, M.; Liu, J. Cost performance of public infrastructure projects: The nemesis and nirvana of change-orders. Prod. Plan. Control 2017, 28, 1081–1092.
  14. Regan, M.; Smith, J.; Love, P.E.D. Financing of public private partnerships: Transactional evidence from Australian toll roads. Case Stud. Transp. Policy 2017, 5, 267–278.
  15. Love, P.E.; Smith, J.; Simpson, I.; Regan, M.; Olatunji, O. Understanding the landscape of overruns in transport infrastructure projects. Environ. Plan. B Plan. Des. 2015, 42, 490–509.
  16. Love, P.; Smith, J.; Regan, M. Comparative procurement methodology analysis in Australia: A new approach. In Proceedings of the W092-Special Track 18th CIB World Building Congress, Salford, UK, 10–13 May 2010; p. 37.
  17. Egan, J. Rethinking Construction, Construction Task Force Report for Department of the Environment, Transport and the Regions; HMSO: London, UK, 2014.
  18. Palaneeswaran, E.; Kumaraswamy, M.M. An integrated decision support system for dealing with time extension entitlements. Autom. Constr. 2008, 17, 425–438.
  19. Radzi, A.; Rahman, R.; Doh, S.; Esa, M. Construction readiness parameters for highway projects. In IOP Conference Series: Materials Science and Engineering; IOP Publishing: Bristol, UK, 2020; p. 012029.
  20. Umar, T.; Egbu, C. Heat stress, a hidden cause of accidents in construction. In Municipal Engineer; Institution of Civil Engineers: London, UK, 2020; pp. 49–60.
  21. Alleman, D.; Antoine, A.L.; Stanford, M.S.; Molenaar, K.R. Project Delivery Methods’ Change-Order Types and Magnitudes Experienced in Highway Construction. J. Leg. Aff. Disput. Resolut. Eng. Constr. 2020, 12, 04520006.
  22. Fathi, M.; Shrestha, P.P.; Shakya, B. Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects. J. Leg. Aff. Disput. Resolut. Eng. Constr. 2020, 12, 04519043.
  23. Husein, A.A.; Majdi, A. Assessment of risk management and evaluate the level of risk in construction project: Case Study. Technium 2020, 2, 66–72.
  24. Imbert, C.; Papp, J. Short-term Migration, Rural Public Works, and Urban Labor Markets: Evidence from India. J. Eur. Econ. Assoc. 2020, 18, 927–963.
  25. Bajjou, M.S.; Chafi, A. Identifying and Managing Critical Waste Factors for Lean Construction Projects. Eng. Manag. J. 2020, 32, 2–13.
  26. Rahman, R.; Radzi, A.; Saad, M.; Doh, S. Factors affecting the success of highway construction projects: The case of Malaysia. In IOP Conference Series: Materials Science and Engineering; IOP Publishing: Bristol, UK, 2020; p. 012030.
  27. Edison, J.; Singla, H.K. Development of a scale for factors causing delays in infrastructure projects in India. Constr. Econ. Build. 2020, 20, 36–55.
  28. Bendi, D.; Rana, M.Q.; Arif, M.; Goulding, J.S.; Kaushik, A.K. Understanding off-site readiness in Indian construction organisations. Constr. Innov. 2021, 21, 106–122.
  29. Kumar, D.; Rahman, Z.; Chan, F.T. A fuzzy AHP and fuzzy multi-objective linear programming model for order allocation in a sustainable supply chain: A case study. Int. J. Comput. Integr. Manuf. 2017, 30, 535–551.
  30. Govindan, K.; Rajendran, S.; Sarkis, J.; Murugesan, P. Multi criteria decision making approaches for green supplier evaluation and selection: A literature review. J. Clean. Prod. 2015, 98, 66–83.
  31. Kotula, M.; Ho, W.; Dey, P.K.; Lee, C.K.M. Strategic sourcing supplier selection misalignment with critical success factors: Findings from multiple case studies in Germany and the United Kingdom. Int. J. Prod. Econ. 2015, 166, 238–247.
  32. Davis, P.; Love, P.E.D.; Baccarini, D. Building Procurement Methods; Cooperative Research Centre for Construction Innovation: Brisbane, Australia, 2008.
  33. Hartmann, A.; Caerteling, J. Subcontractor procurement in construction: The interplay of price and trust. Supply Chain Manag. Int. J. 2010, 15, 354–362.
  34. Hoezen, M.; Voordijk, H.; Dewulf, G. Contracting dynamics in the competitive dialogue procedure. Built Environ. Proj. Asset Manag. 2012, 2, 6–24.
  35. Laan, A.; Voordijk, H.; Dewulf, G. Reducing opportunistic behaviour through a project alliance. Int. J. Manag. Proj. Bus. 2011, 4, 660–679.
  36. Bankvall, L.; Bygballe, L.E.; Dubois, A.; Jahre, M. Interdependence in supply chains and projects in construction. Supply Chain Manag. Int. J. 2010, 15, 385–393.
  37. Baiden, B.K.; Price, A.D.; Dainty, A.R. The extent of team integration within construction projects. Int. J. Proj. Manag. 2006, 24, 13–23.
  38. Dainty, A.; Leiringer, R.; Fernie, S.; Harty, C. BIM and the small construction firm: A critical perspective. Build. Res. Inf. 2017, 45, 696–709.
  39. Briscoe, G.; Dainty, A. Construction supply chain integration: An elusive goal? Supply Chain Manag. Int. J. 2005, 10, 319–326.
More
Information
Contributors MDPI registered users' name will be linked to their SciProfiles pages. To register with us, please refer to https://encyclopedia.pub/register : , , ,
View Times: 607
Revisions: 2 times (View History)
Update Date: 30 Jun 2022
1000/1000